Information for Contractors

Construction Permits 

What is a Common Plan of Development? 

Stormwater Discharge from Large Construction Activities.

Assistance Tool for Construction Stormwater General Permit.

Construction Site Waste

All Construction Site Waste must be disposed of properly.

Stormwater Requirements for a Permit.

less than an acre and not part of a larger common plan of development 

Submit a copy of the Erosion Control Plan with sequences or schedule

Small Construction Requirements: larger than 1 acre but less than 5 or disturbs less that one acre and is part of a larger common plan of development. 

Submit a copy of the Stormwater Pollution Prevention Plan that is in compliance with the Texas Commission on Environmental Quality Construction General Permit (TXR150000) and an additional copy of the map

Submit a copy of the Small Construction Site Notice

Large Construction and Development Requirements for projects larger than 5 acres or disturbs less that one acre whether on their own or as part of a larger common plan of development 

Submit a copy of Stormwater Pollution Prevention Plan (SWP3) Plan and an additional copy of the map

Submit a copy of the Notice of Intent (NOI)

Submit a copy of the Construction Site Notice (Large construction site notice Primary or Secondary Operator).

Submit Notice of Termination upon completion (NOT)